Execution of renewal works to the waterworks gallery and surge tanks of the power plant at Perreres (Aosta).
MAIN WORKS:
• Demolition of rock and concrete
• Creation of metallic lining and cladding with sprayed concrete
• Works in reinforced concrete
• Metal structures
| State |
Completato |
| Start Date |
12/07/2004 |
| End Date |
17/11/2006 |
| Client |
C.V.A. S.p.A. |
| Planning Company |
C.V.A. S.p.A. |
| Country |
ITALY, IT |
| Contract |
Execution of renewal works to the waterworks gallery and surge tanks of the power plant at Perreres (Aosta). |
| Work Type |
SOA “OG6” |